Menu Close
  • 01213564360

Case Study

PROJECT

Whitwick, Coalville

Client: Redrow Homes

Location:  Whitwick, Coalville

Dunton Environmental successfully utilizes Regener8-19 Heavy Metals treatment solution in combination with Bio-Accelerator Hydrocarbon treatment solution, for the remediation and treatment of approximately 7,000tons of Cyanide impacted soils at former gas works off in Coalville. The process reduced the total cyanide concentrations by 93%, within 6 weeks of product application. The process diverted all the waste from hazardous landfill and enabled the safe reuse of the materials on site resulting in a direct cost benefit to the Client.

redrow homes logo

Awarded five star customer satisfaction from the HBF in an independent survey 2019.

“We found Dunton to be a professional and competent subcontractor who performed to programme throughout, adhered to health & safety requirements and provided an excellent service. We were very satisfied.”

Tim Smith
Quantity Surveyor
SpellerMetcalfe