Menu Close
  • 01213564360

Case Study

PROJECT

Wandle River

Client: Redrow Homes

Location: Wandle Riverside Development

Contract Value: £425,000

Scope of Works:

  • Hydrocarbon hotspot remediation
  • Japanese Knotweed treatment and removal
  • River wall works to remove existing river walls and replace with landscaped banks
  • Removal of underground fuel tanks
  • Re-engineering of the ground surface and the construction of pile mats
redrow homes logo

Redrow Homes is one of the UK’s leading house builders, comprising fifteen divisions and operating across much of England and Wales.

Following all specifications set by Redrow Homes, Dunton Environmental –

  • Diverted contaminated soils from hazardous landfill
  • Reduced the import of 6F2 and Type 1 materials
  • Reworked more environmentally friendly and aesthetically pleasing river banks while protecting resident wildlife.

“Dunton have always been pro-active to establish ways to find efficient solutions, both on cost and time which we as a client have benefitted from significantly. In short, they are our go to remediation contractor when it comes to complex schemes.”

Tristin Willis
Production Director
Crest Nicholson Midlands