Remediation & Enabling Works at Jaguar Land Rover

13 Jun 14

Dunton Environmental supported Vinci through the enabling works at the new car manufacturing facility at Jaguar Land Rover’s Solihull plant.

Rapid Remediation of Heavily Contaminated Former London Waste Tip

13 Jun 14

The site, a former East London waste tip with a significant contaminated land legacy, was to be redeveloped on a fast track program by Transport for London. Our integrated waste management solution provided our Client with a 100% cost saving by treating and processing 80,000 tons of contaminated wastes destined for hazardous landfill.

Bulk Decontamination of Heavy Metal Impacted Soils

13 Jun 14

Our sustainable waste management solution saved the Client in excess of £500K by treating 30,000m3 of heavy metal impacted soils for reuse off-site as an engineered fill.